April 27, 2009
Construction is progressing.
In the words of the Mrs Ramos, Sandra said,
"I'm very excited that it is happening soooo fast."
Pamela is in the city buying the doors and water deposit tank and other little things that are now needed.
May 11, 2009
The house construction is coming along quickly. The roof is now on and on Mon 5/11 the plumbing is going in. On Tue 5/12 the electricity should go in. Four clear laminas were installed to help provide light; 2 in the hallway, one that splits the bedrooms and on that splits the kitchen and store area.
May 16, 2009
The main door and two windows should be ready to be installed.
May 20, 2009
Pamela works with the electrician to wire the house. Interior doors hung. The water is all set and plumbed to shower, sink, toliet and kitchen sink, depositing out above roof. The concrete floor is still curing.
May 21, 2009
Electricity works and there is power at the 'plugs'. Connection from shower to water heater is completed. Moldings around the doors installed. |